Lead flashing failure is the most common cause of persistent roof leaks on East Peckham period properties. Medway floodplain humidity in lower village keeps stacks permanently damp is the primary accelerant in East Peckham. We replace chimney aprons, step flashings, valley lead and dormer junctions β Code 5 as standard on all exposed positions. Free diagnosis visit. 7 miles east from Tonbridge.
Lead flashing work in East Peckham requires correct specification β Code 3 on an exposed East Peckham chimney fails within 10 years. We specify correctly by default.
The apron flashing β front face of the chimney β takes the highest weather loading in East Peckham. Code 5 (2.24mm) minimum. Welted joints on all lap positions. Correctly chased into the mortar joint above.
Step flashings up the chimney sides in East Peckham require soakers under each tile course and correctly-overlapping lead steps above. We install to Lead Sheet Association specification throughout.
Open valley lead on East Peckham properties β Code 4 minimum, Code 5 on steep-pitch high-flow valleys. Welted cross-joints every 1.5m maximum. Correctly lapped under tile courses.
Dormer cheek and apron flashings on East Peckham properties require careful dressing to the dormer frame and underlying tile. Failure at dormer flashings is common on 1970s-90s extensions throughout East Peckham.
If you have a persistent leak in East Peckham that has not been correctly diagnosed, we carry out an on-roof investigation and identify the flashing or tile cause. Free investigation with any repair booking.
We specify the correct lead code for every position β Code 3 is too thin for exposed work anywhere in East Peckham. Every quote states the lead code and joint method. If a quote doesn't β ask.
Lead flashing failure in East Peckham is accelerated by Medway floodplain humidity in lower village keeps stacks permanently damp. The housing stock β Victorian terraces and Georgian farmhouses in lower village β means the majority of lead work we attend in East Peckham is on pre-1940 properties where the original flashing specification was modest and has not been upgraded since.
The most common pattern on East Peckham properties: Code 3 flat-lapped lead installed 10-15 years ago is now splitting at lap joints and admitting water that tracks to a ceiling drip remote from the actual entry point. The correct fix is Code 5 with welted joints and a correctly chased top edge β this lasts 40 years in East Peckham's conditions rather than 10.
Call 0173 224 1138 for a free, no-obligation survey and written quote. We cover East Peckham and the surrounding area from our Tonbridge base.
Typical price ranges. All quotes are free, written and fixed-price. Call 0173 224 1138.
| Job Type | Typical Cost | Timescale |
|---|---|---|
| Chimney apron β Code 5 | Β£280βΒ£480 | Halfβfull day |
| Full chimney system β Code 5 throughout | Β£600βΒ£950 | 1β2 days |
| Valley re-lead β Code 5 (per metre) | Β£150βΒ£250 | varies |
| Dormer apron + sides | Β£450βΒ£850 | 1 day |
| Flashing re-chase + re-secure only | Β£150βΒ£300 | Half day |
| Leak investigation + report | Free with repair booking | 1β2 hrs |
"North-facing chimney flashing failed twice in eight years. They specified Code 5 with welted joints β explained why previous repairs had failed. Three winters, completely dry."
"Valley re-lead on a period property β previous lead was Code 3 and had only lasted nine years. New lead in correct Code 5 with welted seams. Completely watertight."
"Persistent leak above the landing β three roofers had looked, none found the source. These found a failed step flashing in 20 minutes on-roof. Fixed same day."
Medway floodplain humidity in lower village keeps stacks permanently damp accelerates lead failure in East Peckham. Code 3 flat-lapped lead in exposed positions fails within 10-15 years. Code 5 with welted joints lasts 40+ years. We specify correctly as standard.
Code 5 (2.24mm) minimum on apron and step flashings. Code 4 on soakers. Code 5 or 6 on back gutters. We state the code in every written quote.
Yes β free leak investigation included with any repair booking. We inspect on-roof, identify the source, and quote the repair at the same visit. Call 0173 224 1138.
Chimney apron: Β£280βΒ£480. Full chimney system: Β£600βΒ£950. Valley re-lead: Β£150βΒ£250/metre. Free written quote on 0173 224 1138.
If the lead has split at lap joints or is pulling from the chase, repair may extend life. If it is undersized (Code 3 on an exposed position), the correct fix is replacement in Code 5. We diagnose on-roof before quoting.
Code numbers refer to lead weight per mΒ²: Code 4 is 1.78mm thick, Code 5 is 2.24mm. Code 5 is the minimum for apron and step flashings on East Peckham exposed chimney positions. Code 3 β commonly installed β is too thin for sustained weather loading and fails within 10β15 years.
10-year written workmanship guarantee on all lead work we carry out in East Peckham. Correct specification is also the best long-term guarantee β Code 5 with welted joints lasts 40+ years.
No call-out fee. No obligation. We serve East Peckham from our Tonbridge base.
0173 224 1138 β Email Us